Equipment is in!

The equipment is in and mostly in-place. Can finally see the plans becoming a reality. Now we wait for inspections before the walls are completed. Meanwhile the menu is coming along... slowly... more on that soon!
Building the counter to support a sneeze-guard, our food warmer, and register.
Dad did not lose his hand, he's waving.
Check out the sweet 2-way swinging door leading to the kitchen.
 
Below is the back kitchen, looking very functional to cook in! Equipment: new 2-door freezer on the left, 3-door refrigerator after it (with door ajar), new 30qt mixer in the back (covered), and under the hood the Blodgett convection oven and oven/range (covered).